IS THE VENT PIPE CORRECTLY INSTALLED?

YES NO

WHAT IS THE STATIC HEAD IN METRES?

METRES

WHAT IS THE CYLINDER THERMOSTAT SETTING?

o

C

BOILER PRIMARY SETTINGS

IS THE PRIMARY SEALED OR OPEN VENTED SYSTEM?

Sealed

Open

IF SEALED THEN WHAT IS THE SYSTEM PRESSURE? Hot Cold

BAR

IF SEALED THEN WHAT IS THE CHARGE PRESSURE OF EXPANSION VESSEL?

BAR

WHAT IS THE AVAILABLE BOILER FLOW TEMPERATURE?

o

C

WHAT IS THE BOILER RETURN TEMPERATURE WHEN CYLINDER/STORE IS SATISFIED?

o

C

COMMISSIONING PROCEDURE INFORMATION

BOILER PRIMARY SETTINGS

WHAT IS INCOMING COLD WATER PRESSURE?

BAR

HAS STRAINER (IF FITTED) BEEN CLEANED OF INSTALLATION DEBRIS?

YES

NO

HAS A WATER TREATMENT DEVICE BEEN FITTED?

YES

NO

IF YES TO ABOVE THEN WHAT TYPE?

ALL MAINS PRESSURE SYSTEMS

ARE T&P AND EXPANSION VALVES FITTED AND DISCHARGE TESTED?

YES

NO

IS PRIMARY ENERGY CUT OUT FITTED (NORMALLY 2 PORT VALVE)?

YES

NO

WHAT IS OPERATING PRESSURE (PRV SETTINGS)?

BAR

WHERE IS PRV SITUATED?

HAS STRAINER (IF FITTED) BEEN CLEANED OF INSTALLATION DEBRIS?

YES

NO

HAS EXPANSION VESSEL OR INTERNAL AIR GAP BEEN CHECKED?

YES

NO

WHAT IS THE CYLINDER THERMOSTAT SETTING?

o

C

UNVENTED SYSTEMS ONLY

HAS THE SYSTEM BEEN EXPLAINED TO THE HOUSEHOLDER?

YES

NO

HAS THE SYSTEMS LITERATURE BEEN LEFT WITH THE HOUSEHOLDER?

YES

NO

ENGINEERS SIGNATURE

CUSTOMERS SIGNATURE