Backfilling, Operation, Opera t ion – Rhinotek 1645 User Manual

Page 77

Advertising
background image

OPERATION

1640-1645 01/11

Operation Section 4-33

© 2011 Alamo Group Inc.

OPERA

T

ION

BACKFILLING

Approach pile with a level bucket.

Poor methods actually move no more dirt and make
it more difficult to hold a level grade.

Do not use bucket in dumped position for
bulldozing. This method, shown above, will impose
severe shock loadings on dump linkage, bucket
cylinder and tractor.

Advertising
This manual is related to the following products: