Electrical operation – Telect DNI-1B User Manual

Page 16

Advertising
background image

Issue A Rev 2

108891

Telect, Inc.

3-1

3

Electrical Operation

DCS wires attach to the lower four wire-wrap termination points on the
rear of the DNI-1B panel (NE-1); the network element wires attach to the
upper four points (NE-2). OUT (transmit) circuits attach to the upper pair
of termination points; IN (receive) circuits attach to the lower pair.

Inside the DNI-1B, the DCS IN circuits are hard-wired to the NE OUT cir-
cuits and the NE IN circuits to the DCS OUT circuits (internal cross-con-
nect, Tip-to-Tip and Ring-to-Ring):

NE-2

(NE)

NE-1

(DCS)

Out

Ground

(Green Wire)

Resistors

In

In

Out

T

R

T

R

T

R

T

R

Cutaway Side View of DNI1-B

Termination Points

Internal
Cross-

Connect

N

E

1

N

E

2

O
U

T

M

O

N

I

N

O

U

T

M

O

N

I
N

All internal con-
nections are wired,

not just chassis

ground and the

termination points.

DCS Out to NE In

Remaining Circuits Are Similarly Wired

Advertising