Installation Checklist

Reference the checklist below to verify all
steps required to successfully install a
deluxe self-contained unit are complete.
This checklist is intended to acquaint the
installing personnel with what is required
in the installation process. It does not
replace the detailed instructions detailed
in the applicable sections of this manual.

WARNING

Hazardous voltage!

Disconnect all electric power, including
remote

disconnects before servicing.

Follow proper lockout/tagout procedures
to ensure

the power can not be

inadvertently energized.

Failure to

disconnect power before

servicing

could result in death or serious
injury

.

General Unit Requirements
†Install and secure the ductwork to the

unit.

†Check unit for shipping damage and

material shortage. Refer to the
Receiving Checklist.

Electrical Requirements
†Verify that the electrical power supply

characteristics comply with the unit
nameplate specifications.

†Inspect all control components; tighten

any loose connections.

†Connect properly sized and protected

power supply wiring to a field supplied/
installed disconnect and unit power
terminal block, or to the optional unit
mounted disconnect switch.

†Properly ground the unit.

Field Installed Control Wiring (Optional)
†Complete the field wiring connections.

Note: All field installed wiring must
comply with NEC and applicable local
codes.

Fan Discharge Conversion

Complete the steps below to convert the
fan discharge from vertical to horizontal.

1. Remove all mid and top fan section

panels.

2. Loosen the brackets inside the unit that

clamp the mid and fan sections
together.

3. Remove the control box cover and

disconnect the motor power wires.
Feed wires up through the unit and
secure out of the way until rotation is
complete.

4. Rotate the fan section to desired

position.

5. Re-route the motor power wires back

to the control box. Ensure all wiring is
free and not routed over any sharp
edges.

6. Reconnect the motor power wires per

the unit wiring diagram.

7. Bolt and/or clamp all brackets back into

place.

8. Replace control box cover and all

exterior panels.

9. Verify the fan rotation and motor amp

draw.

Plenum Installation

1. Uncrate the plenum and accessory

bag.

2. Rotate the evaporator blower to the

vertical discharge configuration.

3. Apply the soft gasket provided around

the aluminum frame on top of the unit
as shown in Figure I-IP-1.

4. Using a screwdriver, tighten the self-

drilling screws as shown in Figure I-IP-
1. Be sure to tighten all screws on the
rear, right, and left sides through the
pilot holes on the plenum panels.

5. When installation is complete, adjust

the motor pulley and the discharge
grille for proper airflow.

installation
procedure

Installation

Figure I-IP-1. Plenum installation

Advertising
This manual is related to the following products: