Vector IVECO MOTOS V08 ENT M12 User Manual

Page 23

Advertising
background image

INSTALLATION DIRECTIVE

MAY 2006

2

V08 EnT M75 - M11 - M12

Supplementary services battery

To assure that the engine can be started with a sufficient

quantity of energy, it is advisable to provide for the instal-

lation of a supplementary battery, dedicated to supplying

power to the on-board electrical services. The power line to

recharge it may be constructed according to the indications

provided in Chapter 20.

If one engine is installed

The battery used for services may be recharged interposing

on the power supply line a relay actuated by the recharge

signal of the alternator’s electronic regulator (L).

If two engines are installed

The presence of two generators allows keeping the recharg-

ing functions separated: the generator (G1) recharges the

battery (AC1) dedicated to starting both engines and pow-

ering both electrical/electronic control circuits, whilst the

generator (G2) recharges the battery (AC2) used to power

the services.

In two-engine applications, it is essential to connect the

engine grounds to a common potential; the solution pro-

posed in Chapter 20 fully complies with this need, assuring

the full functionality and independence of the two circuits.

Relay Box

1. Control selector from bridge or engine room - 2. Power

supply switch of the engine electric circuits - 3. Start button

from engine room - 4. Reset button of the “maintenance

alarm” 5. Button for managing acceleration and deceleration

- 6. Connector for diagnostic instrument -

7. Blink code emission LED (EDC) - 8. Signalling LED of

maintenance interval expiration - 9. Signalling LED for fault

engine operating parameters (WARnInG).

This shall be installed and anchored in such a way as to

dampen the vibrations and stresses occurring when under-

way, and they shall be accessible during servicing operations

and when underway. The electrical commands positioned

on the panel allow controlling engine starting and stopping

directly from the engine room, while excluding any possibil-

ity that anyone may involuntarily start the engine from the

bridge, during servicing operations.

On the relay box is located the multipolar connector (6),

protected by a screw-on lid, for connection with the com-

puterized diagnostic tools prescribed by IVECO MOTORS.

Inside the box, anchored to a printed circuit board, are pres-

ent the power management relays of some components and

the elements that protect the electrical lines against short

circuits or excessive current absorption. These components

perform a similar function to that of fuses, almost totally

avoiding the need to restore the electrical continuity of cir-

cuits subjected to an anomaly condition. These components

are able to limit and eliminate short circuit currents without

melting, restoring their own and the circuit’s electrical conti-

nuity, once the cause of the anomaly is removed.

Figure 18

"2)$'%

2//-

)'.)4)/.

34!24

20-

20-

%.').%

#(%#+

3

05_007_V

2

5

4

6

9

8

7

1

Advertising
This manual is related to the following products: