Installation, How to choose a site, Figure 3-2. proper cable and air clearance – Vanguard Managed Solutions 3400 Series User Manual

Page 40: Caution

Advertising
background image

3-4

Installation and Replacement

Installing The Vanguard 3400 Series

Installation

How to Choose a
Site

Before you install the Vanguard 3400 Series, select a site for the device.
Choose a site that is within an appropriate distance of a power source. Depending on

your application, and the country in which the Vanguard 3400 Series is to operate,

the power source must be a grounded 110 to 220 Vac outlet.
Leave at least 2 inches (5 cm) of clearance in front of the front panel, to allow you to

see the front panel LEDs, and 6-inches behind the unit for cable clearances (see

Figure 3-2). For proper ventilation, leave 2 inches (5 cm) of clearance on the sides.
The site should be free of accumulated dust and environmental extremes. Refer to

Appendix A, Specifications for details.

Figure 3-2. Proper Cable and Air Clearance

Caution

Vanguard 3400 Series devices should be used in environments designed for

computers and electronic equipment. In areas susceptible to lightning, take

precautions to prevent damage to electronic equipment. Contact your telephone

company or an electronic accessories vendor for information on lightning protection

equipment. Customers experiencing problems caused by surges from lightning have

eliminated such problems by installing appropriate surge suppressors on power and

data lines.

Minimum 2-inches (5 cm) Front

and 6-inches (15 cm) Rear

Note: Do not remove the rubber

feet from the bottom of the

unit. They allow for proper

air flow.

Minimum 2-inches (5 cm)

on either side for ventilation.

Advertising