Installation and power requirements – Valco electronic Valve Oven User Manual

Page 14

Advertising
background image

Chapter 1
Valve Oven Overview

Installation and Power Requirements

14

Operating Manual

When up to two Valco Purged valves are required (e.g. applications with
Pulsed Discharge Detector), this option has to be selected for their housing.

For more informations, refer to

Valve Oven Components

.

NOTE

When any Valve box (heated or unheated) is configured with valves, these are factory
tested to verify actuation but are NOT plumbed.

Plumbing can be performed upon availability of plumbing diagrams.

Materials needed:

Shop air or bottled air at a pressure of 60–80 psi

Helium, Nitrogen, or other gas depending on your applications

Installation and Power Requirements

The Valve Oven is attached to TRACE GC Ultra and it is factory installed and
configured. On-site installation is related to the gas plumbing defined by the
customer’s application or accompanying diagram.

Figure 1-2. The Valve Oven and the TRACE GC Ultra

Advertising