Step 2. disassembling the valve and actuator, Figure 2-2. timed event (te) output jacks – Valco electronic Valve Oven User Manual

Page 23

Advertising
background image

Chapter 2

Installing Valves in the Heated Oven

Valve Installation

Operating Manual

23

Figure 2-2. Timed Event (TE) Output Jacks

Step 2. Disassembling the Valve and Actuator

NOTE

Valves are usually installed starting from the mounting hole closest to the rear of the Valve
Oven.

1. Remove any insulation found in the valve mounting hole. The valve mounting

hole is located in the lower Valve Oven heater block.

2. Inspect the valve and actuator being sure the valve is in the counter clock wise

(ccw) position. The ccw position is when the mechanical stop is in the
position noted in Figure 2-3. If the valve is not in the ccw position, locate the
square nut on the opposite end of the actuator (Figure 2-5).

TE #8

TE #7

TE #5

TE #4

TE #3

TE #2

TE #1

TE #6

Sensor

Advertising