White Outdoor Z - 180 User Manual

Page 21

Advertising
background image

21

15. With quarter inch by seven inch pins still installed in the top and bottom linkage arms loosen the jam nuts at

both the front and rear (A) ends of linkage that runs from bottom linkage arms to hydrostatic pumps.

16. Remove quarter inch by seven inch pins from top and bottom holes.

17. Set parking brake, and start the engine (set throttle at full speed). Make sure that the PTO is off.

18. Rotate rods (lengthen or shorten) to bring each hydrostat to neutral.

Note:

The control linkage going to the hydrostatic pump has left-hand threads at the pump and right-hand

threads at the tower.

19. Tighten the jam nuts earlier loosened.

20. Reassemble safety switches.

21. Reassemble body panels.

22. Reassemble drive handle assembly.

23. Make sure that all hardware is tightened.

Advertising
This manual is related to the following products: