through the defrost control boards and safety switches to
energize relays RY1 and RY2, which in turn will energize
contactors 1M & 3M, starting the compressors. Contactors
2M and 4M are energized through the NO contacts on auxil-
iary contactors 1M-AUX and 3M-AUX in order to start the
outdoor fan motors.

4. Relays RY1 and RY2 prevent the electric heat accessory

referenced as standby electric heat from being utilized
whenever the compressor is in operation. This part of the
circuit is covered under HEATING OPERATION.

5. The thermostat will cycle the unit to satisfy the cooling re-

quirements of the conditioned space.

6. After the unit has shutdown from a cooling cycle or a power

interruption, the anti-short cycle feature of the defrost con-
trol board will not permit the unit to restart for 5 minutes.
This feature prevents the unit from short cycling.

7. If the discharge pressure reaches 398 psig, the HP1 or HP2

control will open and the defrost control board will lock out
the compressor. If the discharge temperature reaches
255

°

F, TH2 or TH4 thermostat will open and the defrost

control board will lock out the compressor. If the suction
pressure falls to 7 psig, LP1 or LP2 will open and the defrost
control board will lock out the compressor.

8. If the control that caused the lockout has automatically re-

set, the unit can be restarted by one of the following:

a. Turning the system switch on the thermostat to the

“OFF” position and back to the “COOLING” position.

b. Increasing the set point on the thermostat above the

temperature in the conditioned space and then return-
ing it to its original setting.

c. Opening and closing the power supply main disconnect

switch.

IN ALL THREE RESET METHODS DESCRIBED ABOVE,
A FIVE MINUTE TIME DELAY WILL TAKE PLACE AFTER
THE RESET BEFORE THE UNIT WILL RESTART.

HEATING OPERATION

1. Reversing valve is de-energized and the system will be in

the heating mode.

2. If the fan switch on the thermostat is in the “ON” position, in-

door section blower motor contactor 10M will be energized
through terminal G to provide continuous blower operation.
If the switch is in “AUTO” position, the blower will operate
only when thermostat calls for heating operation.

3. When TH1 of the thermostat closes for first-stage heat, a

circuit is made for the Y terminal on DC1 and DC2 through
the defrost control boards and safety switches to energize
relays RY1 and RY2, which in turn will energize contactors
1M and 3M, starting the compressors. Contactors 2M and
4M are energized through the NO contacts on auxiliary con-
tactors 1M-AUX and 3M-AUX in order to start the outdoor
fan motors.

4. The thermostat will cycle the unit to satisfy the heating re-

quirements of the conditioned space.

5. After the unit has shutdown from a heating cycle or a power

interruption, the anti-short cycle feature of the defrost con-
trol board will not permit the unit to restart for 5 minutes.
This feature prevents the unit from short cycling.

6. If the discharge pressure reaches 398 psig, the HP1 or HP2

control will open and the defrost control board will lock out
the compressor. If the discharge temperature reaches
255

°

F, TH2 or TH4 thermostat will open and the defrost

control board will lock out the compressor. If the suction
pressure falls to 7 psig, LP1 or LP2 will open and the defrost
control board will lock out the compressor.

7. If the control that caused the lockout has automatically re-

set, the unit can be restarted by one of the following:

a. Turning the system switch on the thermostat to the

“OFF” position and back to the “HEATING” position.

b. Decreasing the set point on the thermostat below the

temperature in the conditioned space and then return-
ing it to its original setting.

c. Opening and closing the power supply main disconnect

switch.

IN ALL THREE RESET METHODS DESCRIBED
ABOVE, A FIVE MINUTE TIME DELAY WILL TAKE
PLACE AFTER THE RESET BEFORE THE UNIT WILL
RESTART.

8. Standby electric heat will be controlled by second stage

TH2 of the thermostat and is controlled through low voltage
terminal W1. The standby portion of electric heat cannot
operate because relays RY1 and RY2 are energized,
opening the circuit to W1, whenever the compressor is op-
erating.

9. When second stage heating TH2 is satisfied, the standby

heaters will be de-energized.

DEFROST CYCLE

When condensate freezes on the outdoor coil during heating
operation, it must be defrosted before it blocks the flow of air

across the coil.

1. A defrost cycle will be initiated by the defrost control board's

demand defrost feature which senses both time and out-
door coil temperatures.

2. When the defrost cycle is initiated, the unit operates as fol-

lows:

a. Relays RY3 and RY5 will be energized causing the re-

versing valve solenoids to be energized causing the
unit to switch to the cooling cycle.

b. Contacts in the DC1 and DC2 will open and de-

energize contactors 2M and 4M, causing the outdoor
fan motors to shut down.

c. Standby heat will be energized through contacts in DC1

and DC2. The operation of standby electric heat will
prevent cold drafts in the conditioned space.

3. The defrost cycle will be terminated when:

a. the liquid temperature exceeds 90

°

F, or

b. 10 minutes have passed since defrost initiation.

The 10 minute cycle time (independent of liquid line tem-
perature) is controlled by the defrost control board.

4. At defrost termination, the unit returns to the normal heat-

ing operation.

12