Installa tion - p o w er supply c onnec tion – Zephyr ASL-E42ASX User Manual

Page 19

Advertising
background image

Installa

tion - P

o

w

er Supply C

onnec

tion

11. Replace the lid by following the instructions from step 9 in reverse order, en-

suring that the tab on the lid is within the enclosure.

12. Having connected the equipment to the power supply, you can now continue

with the ceiling mounting instructions.

13. Secure the correct size ducting for your installation (not supplied) to the collar

on top of the housing. Fig.18

14. Extend upper duct cover to the ceiling

and secure it to the duct cover ceiling bra-
cket using the (4) screws previously remo-
ved when the assembly was taken out of
the packaging. Fig. 19

15. Lift the hood assembly into the top duct

cover. Secure hood assembly to bottom
support frame by using (4 type D) screws.
Fig. 20


16. Verify that ducting from hood is con-

nected to ducting in the attic that will
exhaust air out of the home.

- 19 -

Advertising