Installation, Building in – Zanussi ZBD 902 User Manual

Page 6

Advertising
background image

7

INSTALLATION

It is mandatory that all operations required for the
installation be carried out by a qualified or
competent person
- in accordance with existing
rules and regulations.

Please ensure that when the appliance is installed it
is easily accessible for the engineer in the event of a
breakdown.

Fig. 1

BUILDING IN

It is important that the dimensions and materials of
the surround or cabinet into which the oven will be
built are correct and will withstand a temperature
increase of at least 60

°

C above ambient; and that

proper arrangements are made of continuous supply
of air to the oven so it does not overheat.

Dimensions of the appliance and recess required
are given below (Fig. 1-2).

7 min

7 min

878

50

560 min

600

550

50

800 min

Fig. 2

FO 0792

594

888

863

5

20

560

540

20

594

556

19

19

FO 0793

Advertising