Installation preparing for installation – STIEBEL ELTRON SBP E с 12.04.2008 User Manual

Page 17

Advertising
background image

www.stiebel-eltron.com

sBp 1000-1500 e | e sol | e cool |

17

EN

G

LI

SH

installation

preparing for installation

f

f On cylinders supplied horizontally, insert the bottom thermal

insulation section inside the support ring, prior to position-

ing the cylinder. Slightly tip the vertically delivered cylinder

in order to position the bottom thermal insulation section.

f

f Surround the support ring with the bottom thermal insula-

tion ring and secure it with adhesive tape.

f

f Remove the foil from the 5 foam strips (convection brakes)

and stick them around the cylinder in the positions shown.

f

f Prior to fitting them, shape the right hand and left hand ther-

mal insulation sections into a semi-circular form for approx.

10 seconds. A pressure-activated adhesive then holds the

thermal insulation sections in the required shape and makes

fitting them easier.

Please note that the use of tensioning straps may damage the

thermal insulation.

f

f Push the thermal insulation sections over the connections on

the appliance.

f

f Connect the thermal insulation sections at the front by clip-

ping the hook closure strip into the last hook strip. If neces-

sary, the short black cover strips can be used to temporarily

hold the hook closure strips together.

f

f Position the thermal insulation sections around the cylinder

and connect the thermal insulation sections at the back by

clipping the hook closure strip into the first or second hook

strip.

f

f Adjust the thermal insulation sections on the appliance by

patting and pressing them down with the palm of the hand.

f

f Starting from the top, retighten the hook closure strip from

the top until it hooks into the final hook strip.

f

f Place the thermal insulation ring and the two thermal insula-

tion sections on the top.

f

f Place the cover over the thermal insulation sections.

f

f Fit the cover strips onto the hook closure strips. If required,

the cover strips can be trimmed to size.

f

f Fill the hollow spaces near the connections with the soft

foam inserts.

f

f Push the roses and caps into the apertures.

Note

Affix the additional type plate in a clearly visible position

on the thermal insulation.

9.2 installing the manual air vent valve

26

�0

3�

01

�0

97

3

f

f Install a manual air vent valve at the air vent valve

connection.

9.3 Fitting the temperature sensor

f

f Fill the protective pipe with heat conducting paste.

f

f Insert the sensor into the protective pipe until it bottoms.
Prior to inserting contact sensor AVF 6 into the protective pipe,

bend the bias spring forward.

9.4 where appropriate, fit the flanged or threaded

immersion heater.

f

f Remove the dummy flanges and plugs in order to mount

the heat exchanger, flanged or threaded immersion heater.

Maintain the DC separation towards the cylinder.

Advertising