Lanyard deployment test, Figure 8 – lanyard deployment test – ACR&Artex SLB406 ELT User Manual

Page 31

Advertising
background image

ARTEX PRODUCTS / ACR ELECTRONICS, INC

DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL

SLB 406 ELT

Page 31 of 43

MAR 27/11

570-6700 Rev. B

Initial Issue DEC 19/2006

Lanyard Deployment Test

This test ensures that the beacon will activate when the lanyard Activation Lanyard is

removed. The tests should be performed with a fully assembled beacon.

Pull out the Activation Lanyard from the SLB 406 unit. Observe that the unit is activated

by this operation by observing the XMIT LED begins to flash. Deactivate the unit by re-

installing the Activation Lanyard. (Push it back in place), and observing that the XMIT

LED ceases to flash.

The beacon will not begin to transmit for 50 seconds after activation, so this test can be

completed outside the shielded box as long as the Activation Lanyard is re-inserted

within 50 seconds of removal.

Figure 8 – Lanyard Deployment Test


1) Secure the beacon against a secure surface (such as a wall).

2) Using the Pull force gauge in tension mode and on PEAK setting.

3) Apply pressure to tension the lanyard.

4) Pull lanyard with a quick pull action, see Figure 8 above.

5) Deactivate the unit by re-installing the Activation Lanyard (Push it back in place).

Advertising