Veris Technologies OpticMapper - Operating Instructions User Manual

Page 11

Advertising
background image

Pub.# OM17-OpticMapper

3-1

Section 3

Implement Overview and Set-up


Figure 1


If the unit is crated, the row unit (Figure 2) will have to be installed. The row unit mounting location
is shown in figure 3. If equipped, the front tongue many also need to be installed. To do so,
please take precautions to ensure that the framework is properly supported to ensure safety.

Figure 2

Figure 3

Row Unit

Pull-tongue
(opt.)

EC coulter-
electrodes

OpticMapper
Controller

Row unit mount

Weight Mount
for opt. weight
package

Advertising