Veris Technologies OpticMapper - Operating Instructions User Manual

Page 40

Advertising
background image

Pub.# OM17-OpticMapper

6-6













Figure 3.3 Testing cable at end of signal cable wiring harness













Figures 3.4 ab. a. Separating sure-seal connector b. Testing terminal connector wire


4. If there is a >2 ohm reading in the signal cable harness or signal extension cable, visually

inspect the wiring harness and cable extension for damage. If a visual inspection doesn’t
reveal a problem, you will need to test continuity of the wiring harness and cable. You will
need to ohm these cables out individually. Disconnect signal extension cable from
implement and insert ohmmeter leads into sockets as shown below.


Figures 3.5 a and b. Checking continuity of signal extension cable with one ohmmeter lead
contacting pins in extension cable end, and other lead contacting corresponding test box terminal.

1

2

3

4

5

6

Advertising