6 switch-on phase – VEGA VEGASON 61 Foundation Fieldbus User Manual
Page 23
Advertising
23
5 Connecting to power supply
VEGASON 61 • Foundation Fieldbus
28790-EN-130417
5.6 Switch-on phase
After VEGASON 61 is connected to voltage supply or after voltage
recurrence, the instrument carries out a self-check for approx. 30
seconds. The following steps are carried out:
•
Internal check of the electronics
•
Indication of the instrument type, the firmware as well as the sen-
sor TAGs (sensor designation)
•
Status byte goes briefly to fault value
Then the current measured value will be displayed and the corre-
sponding digital output signal will be outputted to the cable.
1)
Switch-on phase
1)
The values correspond to the actual measured level as well as to the settings
already carried out, e.g. default setting.
Advertising