7 switch on phase – VEGA VEGAPULS 62 (≥ 2.0.0 - ≤ 3.8) standpipe ver. 4 … 20 mA_HART two-wire User Manual

Page 24

Advertising
background image

1

1

2

Fig. 17: Wiring plan double chamber housing Ex d

1

Voltage supply/Signal output

5.6 Wiring plan - version IP 66/IP 68, 1 bar

+

-

1

2

Fig. 18: Wire assignment, connection cable

1

brown (+) and blue (-) to power supply or to the processing system

2

Shielding

5.7 Switch on phase

A

fter connecting VEGAPULS 62 to power supply or after a voltage

recurrence, the instrument carries out a self-check for approx. 30
seconds:

l

I

nternal check of the electronics

l

I

ndication of the instrument type, the firmware as well as the

sensor TAGs (sensor designation)

l

O

utput signal jumps briefly (approx. 10 seconds) to the set fault

current

T

hen the corresponding current is outputted to the cable (the value

corresponds to the actual level as well as the settings already carried
out, e.g. factory setting).

Wiring plan

Wire assignment, con-
nection cable

Switch on phase

24

VEGAPULS

62

standpipe version • 4 … 20 mA/HART two-wire

5 C

onnecting to power supply

28737

-EN

-090305

Advertising