VEGA VEGAVIB 65 - two-wire User Manual

Page 24

Advertising
background image

key is lowered in the front plate of the signal conditioning

instrument. Push the test key for >2 seconds with a suitable

object (screwdriver, pen, etc.).
If VEGAVIB 65 is connected to a VEGALOG processing

system or a safety SPLC, you have to interrupt the connection

cable to the sensor for >2 seconds.
After releasing the test key or interrupting the connection cable

to the sensor, the complete measuring system can be checked

on correct function. The following operating conditions are

simulated during the test:

l

Fault signal

l

Empty signal

l

Full signal

16

I/mA

8

2

1,5

3

4,5

t/s

1

2

Fig. 13: Flow chart of the function test

1

Full signal

2

Empty signal

Check if all three switching conditions occur in the correct

sequence and the stated time period. If this is not the case,

there is a fault in the measuring system (see also the operating

instructions manual of the signal conditioning instrument).

Keep in mind that connected instruments are activated during

the function test. By doing this, you can check the correct

function of the measuring system.

(after releasing the test key)

Test procedure

24

VEGAVIB 65 - with two-wire output

Set up

29286

-EN
-060508

Advertising