2 information on foundation fieldbus, Block diagram, measured value processing, Diagram, adjustment – VEGA VEGABAR 54 Foundation Fieldbus - climate compensated User Manual

Page 54: Parameter list, Fig. 26: adjustment vegabar 54

Advertising
background image

54

10 Supplement

VEGABAR 54 • Foundation Fieldbus - climate compensated

36791-EN-130321

Ʋ External housing

IP 65, IP 66/IP 68 (0.2 bar)

Overvoltage category

III

Protection class

II

10.2 Information on Foundation Fieldbus

Block diagram, measured value processing

The following illustration shows the Transducer Block and Function block in simplified form.

t

i

Simulat

e

ALARMS

Out

PV

FIELD-VALUE

Mode & Status

PVF-TIME

LO

W

-C

UT

O

FF

L-TYP

E

OUT-SCALE

PV-SCALE

DIRECT

INDIRECT

INDIRECT

SQRT

bar

%

Lin%

Primary

Value

Secondary

Value 1

Secondary

Value 2

Sensor mounting

correction

AI 2

AI 3

AI 1

TB

Temperature

Sensor_Value

Linearization

adjustment

Channel = 1: Primary Value

Channel = 2: Secondary Value 1

Channel = 3: Secondary Value 2

Channel = 4: Temperature

Fig. 25: Transducer Block VEGABAR 54
TB Transducer Block

AI Function Block (AI =Analogue Input)

Diagram, adjustment

The following illustration shows the function of the adjustment:

Secondary_value_2

scale_in_0 scale_in_100

Sensor_value

0 %

100 %

bar

0,500

-0,500

0

%

100

%

scale_in_100

scale_in_0

Fig. 26: Adjustment VEGABAR 54

Parameter list

The following list contains the most important parameters and their meaning:

primary_value

– Process Value after min/max-adjustment and linearization. Selected as input to AIFB by setting

'Channel' = 1. Unit derives from 'Primary_value_unit'

Advertising