VEGA WEB-VV LH User Manual

Page 10

Advertising
background image

Fig. 3: WEB-VV adjustment interface

1

Dynamic navigation section

2

Static navigation section

3

Breadcrumb navigation

4

Identification section

5

Information and application section

l

Dynamic navigation section: Shows the respective menu items
in dependence on the respective level

l

Static navigation section: Offers the options of global settings
such as language, time and password

l

Breadcrumb navigation: Shows the path of the current page,
provides the option to jump back to higher levels

l

Identification section: Informs you on the current application
level and shows the name of the plant operator, project and
measured value view.

l

Information and application section: Shows the measured
values or allows user-specific settings and selection options

The following steps are the minimum requirement for a measured
value indication:

1

Create a plant operator: The plant operator is the first in the
hierarchy. To visualise measured values, at least one plant
operator must be set up.

2

Create a project: A project includes the assignment of a device
network, the user administration as well as the actual visualisation.

3

Assign a device network: Each device network stands for a
signal conditioning instrument with one or several measurement
loops as well as a data transmission facility.

4

Create a measured value view: The measured value view
defines which measurement loops of a signal conditioning
instrument are combined into a group and made available for
visualisation.

First steps

10

WEB-VV LH • Configuration, first steps

5 Operation

35538

-EN

-090630

Advertising