VEGA WEB-VV LH User Manual

Page 11

Advertising
background image

The prerequisite for working with WEB-VV is the setting up of at least
one plant operator. To do this, select the menu item "Plant operator"
and click the button "Add". Enter the necessary data in the entry mask
and save your setting via the button"Save and quit".

Fig. 4: Creating a plant operator

The creation of a corresponding project is required for measured value
indication. Generally it is useful to create an individual project for each
end customer. To do this select the menu item "Projects" and click the
button "Add". Choose as project name e.g. the plant name or the
customer name. Fill in the other required fields and save your settings
via the button "Save and quit".

Fig. 5: Create a WEB-VV project

After the device network was assigned on site and the measured
values were transmitted to the WEB-VV server, the new device
network must be configured in WEB-VV. Select the menu item "Device
networks
" and select the requested device network from the list. New

Creating a plant opera-
tor

Create a project

Configure/assign a de-
vice network

WEB-VV LH • Configuration, first steps

11

5 Operation

35538

-EN

-090630

Advertising