VEGA VEGAWELL 52 Ship-building User Manual

Page 12

Advertising
background image

12

2 Mounting

VEGAWELL 52 • Service tanks (fuel, coolant)

41957-EN-130626

1
2

3

4
5

6

Fig. 10: Threaded fitting
1 Suspension cable

2 Seal screw

3 Cone bushing

4 Seal cone

5 Threaded fitting

6 Seal

1. Remove filter element from the breather capillaries (8).
2. Shift the suspension cable from below through the opened

threaded fitting.

1

8

2

3
4

5

6
7

Fig. 11: Wire assignment connection cable with breather capillaries
1 Brown (+): to power supply or to the processing system

2 Blue (-): to power supply or to the processing system

3 White: for processing of the integrated Pt 100 (power supply)

4 Yellow: for processing of the integrated Pt 100 (measurement)

5 Red: for processing of the integrated Pt 100 (measurement)

6 Black: for processing of the integrated Pt 100 (power supply)

7 Shielding

8 Breather capillaries with filter element

3. Slide the seal cone and the cone sleeve over the suspension

cable, fasten manually with the seal screw

4. Place the filter element immediately back on the breather capillar-

ies (8)

Caution:

The filter element must be plugged back onto the breather capillaries.
Avoid immersing the cable end into liquids

Advertising