Warning, Qb c b c – Peerless-AV EXC-W - Installation User Manual

Page 10

Advertising
background image

10 of 11

ISSUED: 1-11-08 SHEET #: 055-9495-3 09-18-12

Visit the Peerless Web Site at www.peerless-av.com

For customer care call 1-800-865-2112 or 708-865-8870.

Cut cable covers (Q) to the length of inner channel (C) and outer channel (B) openings, leaving space for cables if
routed through channels. Snap cable covers (Q) into openings as shown.

8

CABLES

CUT TO
LENGTH OF
OPENING

Q

CUT TO
LENGTH OF
OPENING

Q

CABLES

CEILING INSTALLATION

WALL INSTALLATION

(EXCEPT FOR EXC MODELS)

CUT TO
LENGTH OF
OPENING

Q

CUT TO
LENGTH OF
OPENING

Q

B

C

B

C

7

CEILING INSTALLATION

WALL INSTALLATION

(EXCEPT FOR EXC MODELS)

D

D

Install Cable Covers

Adjusting Mount Extension

• On ceiling installations, clamp plate adjustment screws support weight of projector when fully tightened. Weight of

the projector will need to be supported if clamp plate screws are loosened.

WARNING

While supporting the weight of the projector, loosen clamp plate screws half a turn and position projector to the
desired extended position. Retighten clamp plate screws securely.

CLAMP PLATE

SCREWS

CLAMP PLATE

SCREWS

Advertising