Troubleshooting worksheet, 1 troubleshooting worksheet – R&M Materials Handling ELECTRIC CHAIN HOISTS LoadMate Chain Hoist TMU Motorized Trolley User Manual

Page 29

Advertising
background image

LM

TMU I&M MANUAL/EN/06.15.2009


29/38

This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret
that may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2009) R&M Materials Handling, Inc. All rights reserved.

4.3.1 Troubleshooting

Worksheet

Table 13. Measure and Record Information

Main hoist power leads L1-L2

Main hoist power leads L2-L3

Main hoist power leads L1-L3

Main hoist power leads L1-Gnd

Main hoist power leads L2-Gnd

Main hoist power leads L3-Gnd

Inverter Input power leads L1-L2

Inverter Input power leads L2-L3

Inverter Input power leads L1-L3

Inverter Input power leads L1-Gnd

Inverter Input power leads L2-Gnd

Inverter Input power leads L3-Gnd

Indicate Grounding system:

4

th

conductor of main power

Frame ground

Connected to hardware

None

Indicate Collector System:

Double shoe on each runway conductor

Single shoe on each runway conductor

Indicate Control Transformer Voltage: ____________________ VAC

Indicate Power Supply Size to the equipment:

< 500 KVA

>

500 KVA

Advertising