Product description, Step 1 – unpack and inspect – GE Industrial Solutions Record Plus Motor Operator Mechanism: FC100 User Manual

Page 2

Advertising
background image

Product Description

These instructions describe the installation
procedures for the Motor Operator Mechanism
accessory on

Record Plus™

circuit breakers, as

illustrated in Figure 1.
The complete kits are available in the catalog
numbers mentioned in Table 1.
The kit is common to all the catalogs, providing

the necessary parts for mounting the motor

operator mechanism on the breaker as shown in

Figure 2.

Step 1 – Unpack and Inspect

Unpack the Motor operating mechanism kit and

inspect the parts for any shipping damage. Verify

that all parts are supplied, as listed in Table 2. The

parts are illustrated in Figure 2.

Note that the numbers in brackets in the following

figures and installation instructions refer to the

item numbers in Table 2.

Item Description

Qty.

1 Top

Bolting

Plate

1

2 Mounting

Screw

2

3

Screw, #8-32 x 3.50"

2

4

Screw, #8-32 x 0.375"

2

5 Lock

Washer

4

6

Nut, Hex #8-32

4

7 Wing

Screw

#10-24

1

8 Grounding

Wire

1

9 Motor

Operator

Mechanism

1

Table 2. List of parts included in the Motor operator

Mechanism kit.

Step 2 – Install the Breaker and

Motor Operating Mechanism

1.

Move the breaker handle to the OFF position.

2.

Mount the breaker with mounting screws[2],

# 8-32 x 3.50" screws [3] and Top bolting

plate[1], as illustrated in Figure 3. Tighten the

screws to 16 - 20 in-lb.

Complete the installation

of the circuit breaker according to installation

instructions DEH40463.

3.

Position the Mounting bracket of motor

operator assembly on the breaker, as illustrated

in Figure 4. Insert two #8-32 x 0.375" screws

[4] through the mounting holes in the

mounting bracket and into the heads of the

breaker mounting screws [1], with the

grounding wire [8] attached to one of the

screws. Tighten the screws to 16 - 20 in-lb.

Secure the other end of the grounding wire to a

suitable ground location.

[9]

[4,5]

[8]

[7]

Figure 2. Parts supplied in the Motor operator kits.

Figure 3. Mounting the breaker.


[1]

[2]

[3,5]

[1]

[2]

[3]

[6]

Advertising