Page 5: Danger

Advertising
background image

71R

-4000B

3

ZBTS / ZBTSD Operation & Maintenance Manual

Installation

(cont’d)

Engine Start
Control Connections

The engine-start terminals are clearly identified by a label
on the microcontroller backplate. In the case of manual
transfer switches, or in other applications not requiring
the microprocessor, clearly marked terminal blocks are
provided in the upper left corner of the control panel
for the engine start control wires.

Figure 2 shows location of engine start connections for
Bypass Isolation Transfer Switch. Figure 6 (pg.5) shows
location of engine start connections for Automatic
Transfer Switch.

Terminals for field connections to the A3 Source 2 auxiliary
contacts and the A4 Source 1 auxiliary contacts are also
provided. These terminals are clearly marked and appear
on the side of the power panel. On 400 amp metal frame
units these terminals appear on the bracket above the
operator handle.

Initial Energization

Before proceeding, refer to the information package
supplied with the ATS and read and understand the
information on all accessories provided.

1.

Unlock the enclosure.

2.

Open the enclosure.

3.

Verify the correct system voltage.

NOTE

: The equipment rating nameplate on the

transfer switch lists the voltage. See

Figure 4.

4.

Close Source 1 circuit. breaker.

NOTE

: The controller will illuminate Source 1

Available LED if proper voltage is sensed.

5.

Verify the phase to phase voltages at Source 1
line terminals.

6.

Close Source 2 circuit breaker.

7.

Start the generator’s engine.

NOTE

: The controller will illuminate Source 2

Available LED when preset voltage
and frequency levels are reached.

8.

Verify the phase to phase voltages at Source 1
line terminals.

9.

Verify that the phase rotation of Source 1
is the same as the phase rotation of
Source 2.

10. Shut down the generator’s engine.
11. Place the starting control in the
Automatic position.
12. Complete the visual inspection of the transfer switch.
13. Close the enclosure.
14. Lock the enclosure.14. Lock the enclosure.

Figure 2

E

4

5

6

1

2

3

P Relay

(Engine Start)

Contact rating is
10 Ampere at 120VAC
or 28VDC Gold plated

Control Power Supply

Input/Output

option relays.

Engine Start

Connections

E11
E12

E12A

E13

Auxiliary contact

connections.

A4-1
A4-1
A4-2
A4-2
A3-1
A3-1
A3-2
A3-2

XBN

XBE

Interlock Logic

Assembly

ATR

A4B-1
A4B-1
A3B-1
A3B-1

RNH

Interconnect plug plate

HAZARDOUS VOLTAGE

(Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

DANGER

Figure 3A –
Horizontal
Bypass/Isolation
Transfer Switch
Customer
Connections

Figure 3 (Typical)

Advertising