Step 6 – check breaker functions – GE Industrial Solutions Record Plus Shunt Trip and Undervoltage Release User Manual

Page 4

Advertising
background image

These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency

that may be met in connection with installation, operation, or maintenance. Should further information be desired or

should particular problems arise that are not covered sufficiently for the purchaser’s purposes, the matter should be

referred to the GE Company. The circuit breaker is a sealed unit that contains no user-serviceable parts. Tampering

with the seal will void the warranty.

g

GE Industrial Systems

General Electric Company

41 Woodford Ave., Plainville, CT 06062

www.geindustrial.com

DEH40363 R03 0808

© 2003 General Electric Company

Step 6 – Check Breaker

Functions

Perform operational checks to insure proper

functioning of the new accessory.

• For a shunt trip, apply the rated voltage and verify

that the breaker trips.

• For an undervoltage release, apply the rated

voltage to allow the breaker to close, then remove

the voltage and verify that the breaker trips.

See NEMA publication AB4 for further details.

WARNING

: It is important that the cover is installed

correctly to ensure proper circuit breaker operation.
AVERTISSEMENT: Il es important de verifier que

tout cuvercle ou cache de protection est

correctement installe afin d’assurer le bon

fonctionnement de l’appareil.