Power Break® II Motor Operator Mechanism

Installation in 800–2000 A Draw-Out Breaker

7

2

2

2

2 8

8

8

8 .... Reattach the breaker lifting bar, as illustrated in

Figures 10 and 11.

2

2

2

2 9

9

9

9 .... Pull out the substructure rails until they drop into

the horizontal locked position. Lower the breaker
so that the grooves in the rollers drop over the
rails.

3

3

3

3 0

0

0

0 .... Ensure that the grooves in all rollers straddle the

rails, then remove the Lifting Bar and push the
breaker into the substructure until it stops in the
DISCONNECTED position. Then lift the rails and
push them into the stored position.

2

2

2

2 8

8

8

8 .... Engage the

1

2

-inch square end of the racking shaft

with the supplied wrench and rotate the shaft
clockwise to draw the breaker into the TEST or
CONNECTED position, as illustrated in Figure 8.

Figure 14. Racking chain removed from the gear.

Figure 15. Removing the screw holding the secondary terminal block in

place.

Figure 16. Breaker resting on its back, ready for installation of the

Motor Operator Mechanism.

Chain

Terminal

Block

Screw Location

800–2000 A

Screw Location

2500–4000 A

Nylon

Plunger