Use the following procedure to install the
Auxiliary Switch accessory into the circuit
breaker.

1. Verify that the rating on the Auxiliary Switch
identification plate matches the voltage rating
required for the application, as listed in Table 1.

2. Side mounted Breakers are limited to
maximum 5 NO & 5 NC contacts.



3. Verify Secondary Disconnect Block B is present.


4. Turn the breaker off and discharge the closing
springs by depressing the OFF and ON buttons in
the sequence OFF-ON-OFF. Verify that the

breaker OFF-ON indicator shows OFF on a green
background and that the charge indicator shows
DISCHARGE on a white background. If installing
in a draw-out type breaker remove breaker from
adaptor (cassette) before continuing.


5. Loosen the 6 screws on front cover (fascia)
using a posidrive screw driver as shown in Fig 1.B
Rotate the charging handle down and slide the
front cover over the handle to remove the front

cover as shown in Fig. 1.C.

Figure 1. (A) Front Cover (B) Screw Removal (C) Handle

Rotation

6. Unplug the existing Auxiliary switch connector
plugs from the secondary disconnect as shown

in Fig. 2.

Figure 2. Unplug the existing connectors.


7.

Remove the e-ring from the Auxiliary switch

link to the mechanism as shown in Fig. 3.

Figure 3. E-ring removal

8. Remove the existing M5 nut & M6 screw from
the assembly as shown in Fig. 4.

Figure 4. Remove the Screw & nut

9. Remove the existing Auxiliary switch assembly
from the housing as shown in Fig. 5.