GE Industrial Solutions EntelliGuard G Auxiliary Switch User Manual
Page 3
Figure 5. Remove the existing Auxiliary switch
on
g as shown in Fig. 6.
assembly
10. Insert the new Auxiliary switch assembly
e housin
th
Figure 6. Assemble the Auxiliary switch
ts as
xplained in step 6.
ing between the Auxiliary
witch link and the mechanism link as shown in
11.
Assemble back the screw and nu
e
12. Assemble the e-r
s
Fig. 7.
Figure 7. E-ring assembly
13. Plug the connectors from the Auxiliary switch
into the secondary disconnect terminals marked
as A14, A15 etc (refer wiring diagram for all wiring
points) in the respective terminals as shown in
Fig. 8.
Figure 8. Connector’s assembly
9.
To reinstall the cover, rotate the charging
handle down and slide the front cover over the
handle to assemble the front cover to housing as
shown in Fig. 9.
Figure 9.
10. Ensure the fascia is aligned properly with the
trip unit and the pad lock features of the breaker.
11
.
Fasten the 6 mounting screws of fascia with
the housing using a pozidrive screwdriver. Apply
torque of 6 Nm (4.42 ft-lbs).
3