Spectra Series™ Power Panelboards

Circuit Breakers and Modules

WARNING:

Danger of electrical shock or injury.

Turn

OFF power ahead of the panelboard or

switchboard before working inside the
equipment or removing any component

.

Do

not remove circuit protective devices or any
other component until the power is turned
OFF.

General

These instructions apply to the following catalog numbers:

•Circuit breaker modules AMC6FJ, AMC4FJ, AMC3FJ,

AMC2FJ, AMC6FLS, AMC3FLS, AMC2FLS, and
AMC4FLS

•Circuit breaker frames TFJ, TFK, THFK, TFL, SFHA,

SFLA, and SFPA

Installation

1. Phase balancing for two-pole devices in three-phase

systems.

To balance the panelboard load, remove the

screws on the appropriate bus clip, reposition the bus
clip as shown in Figure 1, then install and tighten the
screws to 27–32 in-lb.

Figure 1. Repositioning the bus clip to balance the load.

2. Prepare the breaker module.

Remove the protective

caps or insulating tape only from the tops of the stud
posts to which the circuit breaker is to be attached, as
shown in Figure 2. Fasten the filler supports, as shown
in Figure 3, with #10-32 x

3

/

4

" hex-head screws

tightened to 15–20 in-lb. The proper position of the
filler support is listed in Table 1.

Figure 2. Removing the caps or tape from the stud posts of the

breaker module.

Figure 3. Fastening the filler supports in position.

Breaker
Module

Filler Support

Position

AMC6FJ
AMC4FJ

AMC6FLS

4

AMC3FJ
AMC2FJ

AMC3FLS

1

Table 1. Filler support position per module type.

GEH5626 Installation Instructions

R04

A & C Phase
As Received

A & B Phase

B & C Phase

Protective Cap

or Insulating

Tape

Stud Post

Filler

Support

#10-32 x

3

/

4

"

Hex-Head

Screw