List of figures – GE Industrial Solutions ProTrip Conversion Kits AK-15, AK-25, and AKU-25 User Manual

Page 3

Advertising
background image

3

LIST OF FIGURES

1. Arc chute retainer and arc chutes. ................................................................................................................... 5

2. Screw to be removed from connecting links. ................................................................................................... 5

3. Breaker bottom bracket connected to the escutcheon and the back frame .................................................... 6

4. Type EC-2A trip device, with adjacent device removed................................................................................... 6

5. Front view of the front frame, showing relocation of the X and Y relays.......................................................... 7

6. Right side view of the front frame, showing relocation of the Y relay. ............................................................. 8

7. Y relay installed on the arc chute retainer........................................................................................................ 8

8. Unassembled flux shifter and mounting hardware........................................................................................... 8

9. New flux shifter installed on the right side of the breaker mechanism (shown in the

reassembled breaker). ..................................................................................................................................... 9

10. Mounting and adjusting the flux shifter shown from the right side of the mechanism. .................................... 9

11. Flux shifter as isntalled on the breaker. ........................................................................................................... 9

12. Trip unit, mounting plate, support bracket, and harness................................................................................ 10

13. Trip unit support bracket mounted to the breaker frame on a manually operated stationary

breaker. .......................................................................................................................................................... 10

14. Trip unit support bracket mounted to the breaker frame on an electrically operated draw-out

breaker. .......................................................................................................................................................... 10

15. Bottom view of the trip unit support bracket installed on an electrically operated breaker,

showing the X relay and insulator. ................................................................................................................. 11

16. Trip unit attached to the mounting plate......................................................................................................... 11

17. Trip unit and mounting plate attached to the breaker. ................................................................................... 12

18. Flux shifter wiring harness in place. ............................................................................................................... 12

19. Components for the current sensor assembly for one pole. .......................................................................... 13

20. Current sensor assembly, right-side view. ..................................................................................................... 13

21. CT terminal board bracket and insulator installed.......................................................................................... 13

22.

Completed

CT installation.. ............................................................................................................................ 13

23. Right-side view of the back frame, showing installation of the flux shifter actuator bushing. ........................ 14

24. Modification of the lower stud shields. ........................................................................................................... 15

25. Primary disconnect modification for AK-15 breakers. .................................................................................... 15

26.

Neutral

sensor outline .................................................................................................................................... 16

27. Cabling diagram for PtoTrip™ trip units with ground fault on four-wire loads. .............................................. 19

Advertising