Removal of the existing trip device – GE Industrial Solutions ProTrip Conversion Kits AK-15, AK-25, and AKU-25 User Manual

Page 6

Advertising
background image

6

7. Remove the two mounting screws and lock washers

attaching the bottom bracket to the escutcheon, as
shown in Figure 3.

8. Loosen the recessed Allen screw in the side of the

charging handle base and lift off the handle.

9. Remove the snap ring and flat washer on the

charging handle mounting shaft.

10. Remove the four Philips-head screws and lock

washers on the front of the escutcheon and lift off the
escutcheon.

11. Lift the bottom bracket from its back frame

attachment.

12. Remove the nuts and washers securing the front

frame to the two long studs from the back frame.

13. Remove the nuts and washers on the studs con-

necting the front frame bracket to the back frame
(one on each side).

14. Lift the front frame off the back frame.

Removal of the Existing Trip Device

Figure 4 shows an existing Type EC-2A trip device with
the adjacent trip device already removed, to illustrate this
procedure.

1. Remove the existing overcurrent trip devices and trip

paddles.

2. On draw-out breakers, remove the primary dis-

connects from the bottom (load) copper studs.

3. Remove the three bottom (load) copper stud

assemblies. On Power Sensor-equipped breakers,
these will have been removed with the trip devices.

4. On breakers equipped with Type EC trip devices,

remove and discard the mounting brackets on the
lower front of the back frame.

Figure 3. Breaker bottom bracket connected to the

escutcheon and the back frame.

Figure 4. Type EC-2A trip device, with adjacent device

removed.