GE Industrial Solutions EntelliGuard G Coil Signaling Contacts User Manual

Page 2

Advertising
background image

Rotate the charging handle down and slide the
front cover over the handle to remove the front
cover as shown in Fig. 1.C.

Figure 1. (A) Front Cover (B) Screw Removal (C) Handle

Rotation

4. Remove the existing coil from the mechanism.

5. Remove the coil cover by pressing the three

snaps as shown in Fig. 2

.

Figure 2. Removing the existing cover


6. Align the new cover with Release Indication

Contacts on the coil as shown in Fig. 3.

Figure 3. Cover assembly

7. Guide the wires in the wire opening of the coil
housing as shown in Fig. 4. Press the cover and

ensure the 3 snaps are engaged with the
openings in the coil housing.

Figure 4. Cover assembly


8. Tilt the coil forward and engage the front hooks
into the mechanism top support plate as shown
in the Fig. 5.

Figure 5. Assembly of coil


9. Plug the connector from the Release
Indication Contact cover with the connectors
from the harness of the trip unit as shown in Fig.6.
While connecting ensure the coils are connected

with the correct connectors from the harness
such as marked as ST1/UV1/CC/ST2&UV2 from
the respective coils.

2

Advertising