GE Industrial Solutions EntelliGuard G Coil Signaling Contacts User Manual

Page 3

Advertising
background image

Figure 6. Assembly of connector

7. Tilt the device backwards until the rear hooks
engage in the slots on the mechanism top

support plate as shown in the Fig. 7

.

Figure 7. Assembly of coil

8. Connect the input wire assembly plug to the
terminal locations in the SD A block of the
respective coil as shown in Fig. 8


Figure 8. Assembly of connector plug

9. Assemble the connector plug from the coils
status switch cover to the terminal locations in
SD block B as shown in Fig. 9.

Figure 9. Assembly of connector plug


10.

To reinstall the cover, rotate the charging

handle down and slide the front cover over the
handle to assemble the front cover to housing as

shown in Fig. 10.

Figure 10.


12. Ensure the fascia is aligned properly with the

trip unit and the pad lock features of the breaker.



13

.

Fasten the 6 mounting screws of fascia with

the housing using a pozidrive screwdriver. Apply

torque of 6 Nm (4.42ft-lbs).

3

Advertising