GE Industrial Solutions Spectra Series Power Panelboards AMC6JK, AMC4JK, ACM3JK and AMC2JK User Manual

Spectra series™ power panelboards, General, Installation

Advertising
background image

g

Spectra Series™ Power Panelboards

Circuit Breakers and Modules

WARNING: Danger of electrical shock or injury.

Turn

OFF power ahead of the panelboard or

switchboard before working inside the

equipment or removing any component

.

Do

not remove circuit protective devices or any

other component until the power is turned

OFF.

General

These instructions apply to the following catalog numbers:

• Circuit breaker modules AMC6JK, AMC4JK, ACM3JK

and AMC2JK

• Circuit breaker frames TJK, TJD, TJJ, THJK, TJ4V,

THJ4V, and, TJL4V.

Installation

1. Phase balancing for two-pole devices in three-phase

systems. To balance the panelboard load, remove the

screws on the appropriate bus clip, reposition the bus

clip as shown in Figure 1, then install and tighten the

screws to 27–32 in-lb.

Figure 1. Repositioning the bus clip to balance the load.

2. Prepare the breaker module. Loosen the latch lock

screws and fully retract the rail latches. Line up the

guide fingers on both ends of the module with the

notches in the panelboard interior rails, as shown in

Figure 2.

Figure 2. Preparing the circuit breaker module for installation.

3. Install the module. Latch one side of the circuit

breaker module. Release the rail latch. Pivot the

module onto the bus bars and engage the second

latch. Release the rail latch. Tighten the rail latch

screws to 25 in-lb as shown in Figure 3.

Figure 3. Installing the circuit breaker module.

GEH5624 Installation Instructions

R03

A & C Phase

As Received

A & B Phase

B & C Phase

Latch

Screw

Rail

Latch

Latch

Screw

Advertising
Table of contents