Geh-5624p2 – GE Industrial Solutions Spectra Series Power Panelboards AMC6JK, AMC4JK, ACM3JK and AMC2JK User Manual

Page 2

Advertising
background image

4. Install the circuit breaker on the module.

a. For main devices (lugs only on

ON

side of circuit

breaker). Place the

OFF

side of the circuit breaker

over the stud posts, as shown in Figure 4, with the

formed barriers on the module underneath the

breaker. Secure the breaker to the module with

round-head screws and lock washers tightened to

35–50 in.-lb. and to the stud posts with nut-washer

assemblies tightened to 80–110 in-lb.

Figure 4. Installing a main breaker.

b. For center-mounted branch circuit breakers (lugs on

OFF

side of breaker). Place the

ON

side of the circuit

breaker over the stud posts, as shown in Figure 5,

with the formed barriers on the module underneath

the breaker. Secure the breaker to the module with

round-head screws and lock washers tightened to 35–

50 in.-lb. and to the stud posts with nut-washer

assemblies tightened to 80–110 in-lb.

Figure 5. Installing a center-mounted branch breaker.

c. For double-mounted branch circuit breakers. Place

the

ON

side of each circuit breaker over the stud

posts, as shown in Figure 6, with the formed barriers

on the module to the outside of the breakers. Secure

the load ends with round-head screws and lock

washers tightened to 35–50 in.-lb. Place the straps

across the line terminals of opposing breakers and

secure with nut-washer assemblies tightened to 80–

110 in-lb.

Combinations of TJK, TJD, TJJ, and THJK breakers

may be used and combinations of TJ4V, THJ4V, and

TJL4V breakers may be used.

Figure 6. Installing a double-mounted branch breaker.

d. For one circuit breaker mounted on a double-branch

module. Place the

ON

side of the circuit breaker over

the stud posts, as shown in Figure 7, with the formed

barriers on the module to the outside of the breaker.

Secure the load end with round-head screws and lock

washers tightened to 35–50 in.-lb. Place one spacer

over each of the unused stud posts. Place one strap

across each breaker line terminal and the opposite

spacer and secure with nut-washer assemblies

tightened to 80–110 in-lb.

Figure 7. Installing one breaker on a double-branch module.

Round-Head

Screw & Lock

Washer

Nut-Washer

Assembly

Barrier

Barrier

Stud

Post

Round-Head

Screw & Lock

Washer

Nut-Washer

Assembly

Barrier

Barrier

Stud

Post

Round-Head

Screw & Lock

Washer

Stud

Post

Strap

Strap

Nut-Washer

Assembly

Round-Head

Screw & Lock

Washer

Stud

Post

Strap

Strap

Nut-Washer

Assembly

Barrier

Barrier

Advertising