Power break, Circuit breakers chapter 3. accessories, 3–4 undervoltage release device – GE Industrial Solutions Power Break I 800-2000 Frames 240-600 VAC User Manual

Page 20

Advertising
background image

Power Break

®

Circuit Breakers

Chapter 3. Accessories

14

3–4 Undervoltage Release Device

The undervoltage release device (UVR), shown in Figure
28, opens the circuit breaker when the supply voltage
drops to 35–60% of its rated value. Figure 29 shows the
dropping resistor supplied with 240–600 volt UVRs. The
UVR electrical characteristics are listed in Table 6. The
UVR wiring diagram is in Figure 30.

Figure 28. Undervoltage release device.

Figure 29. Dropping resistor supplied with 240–600 V UVRs.

Figure 30. UVR wiring diagram.

Catalog

Number

Voltage

Rating

Continuous

Current, mA

Dropping
Resistor*

TPUV1S

120 Vac

25

none

TPUV2S

240 Vac

25

5000 ?, 25 W

TPUV2S

480 Vac

25

15,000 ?, 50 W

TPUV6S

600 Vac

25

20,000 ?, 50 W

TPUV7S

12 Vdc

211

none

TPUV8S

24 Vdc

104

none

TPUV9S

48 Vdc

54

none

TPUV10S

125 Vdc

24

none

TPUV11S

250 Vdc

24

5000 ?, 25 W

* Ohmite Type 270

Table 6. UVR electrical characteristics.

UVR Installation

1

1

1

1.... Remove the circuit breaker cover(s) as described

above in

3–2 Circuit Breaker Cover.

2

2

2

2.... The UVR assembles to a mounting plate. Not all

breakers are shipped from the factory with a mount-
ing plate. Some breakers have only an L-shaped
bracket to retain the molded-plastic crank. A mount-
ing plate is provided in the UVR kit.

• If the breaker is supplied with an L-shaped

bracket, remove the two retaining screws and dis-
card the bracket. Follow the

Mounting Plate

Installation instructions and continue on to step
3.

• If the breaker is supplied with a mounting plate,

continue with step 3.

3

3

3

3.... Remove the slide reset lever spring from the mount-

ing plate, as shown in Figure 31. Be careful not to
nick or damage the spring in any way, since it will be
needed for reassembly.

4

4

4

4.... Push the latch and slide reset lever forward to pro-

vide mounting clearance for the UVR assembly.

5

5

5

5.... Position the UVR assembly mounting bracket so that

its retaining hole engages the latch pivot post, as
shown in Figure 32.

6

6

6

6.... Line up the UVR bracket’s mounting hole with the

tapped hole in the accessory mounting plate. Install
the screw and lock washer, as shown in Figure 33.
Tighten the screw to 9–11 in-lbs.

7

7

7

7.... Replace the slide reset lever spring, shown in Figure

31.

8

8

8

8.... Remove the knockouts in the side of the base, as

required. Each knockout will accommodate up to
three bundles of wire. Remove all sharp edges with a
file.

9

9

9

9.... Remove all debris from the inside of the breaker.

Advertising