GE Industrial Solutions Power-Vac Metal Clad Switchgear; Addendums User Manual

Page 10

Advertising
background image

59

Fig A(2)-1

Sectional view of inter-unit bolting



Fig A(2)-2

Typical Center-post bolting

The center-post bolting has to be done at 2 places in the front upper compartment and at
two places in the front bottom compartment. The 3.25 inch long bolts may be used where
it is required to bolt through the red glastic sheet shown in the upper portion of Fig A(2)–
2.

Front

Rear

Center-post ( 4 places)

Center-post bolting

Factory connections

Perimeter

bolting

Perimeter

bolting

Advertising