GE Industrial Solutions Power-Vac Metal Clad Switchgear; Addendums User Manual
Page 10
Advertising
59
Fig A(2)-1
Sectional view of inter-unit bolting
Fig A(2)-2
Typical Center-post bolting
The center-post bolting has to be done at 2 places in the front upper compartment and at
two places in the front bottom compartment. The 3.25 inch long bolts may be used where
it is required to bolt through the red glastic sheet shown in the upper portion of Fig A(2)–
2.
Front
Rear
Center-post ( 4 places)
Center-post bolting
Factory connections
Perimeter
bolting
Perimeter
bolting
Advertising