GE Industrial Solutions Power-Vac Metal Clad Switchgear; Addendums User Manual

Page 3

Advertising
background image

52

Fig – A(1)-3

View looking up into the front bottom compartment of a 2 High-A rollout stack

Step – 2, Remove vertical mid barrier in front lower compartment

Remove the vertical mid barrier located in the upper part of the lower front compartment.
This barrier is located approximately 49 inch from the front of the stack. See Fig – A(1)-
4a for identification of barrier in the breaker compartment and A(1)-4b for identification
of barrier in a PT/CPT rollout compartment



Step – 3, Remove vertical mid barrier in front upper compartment

Remove the vertical mid barrier located in the lower part of the upper front compartment.
This barrier is located approximately 49 inch from the front of the stack. See item # 3 of

This barrier can be

removed when the 3

taptites are removed.

Remove this

barrier

The underside of

the taptites

Remove this

barrier

Fig A(1)-4a

View looking into typical

front lower breaker

compartment

Fig A(1)-4b

View looking into typical

front lower PT/CPT rollout

compartment