56
Fig – A(1)-9
Shows rubber cushion inserted over bus
Step 8, Finishing up
a) Re-assemble the boots that were removed in step 4.
b) Remove tape applied in step 5a ( for porcelain only )
c) Ensure that no tools or other material is left behind in the bus compartment
d) Re-assemble the vertical mid-barriers and the horizontal pan that were removed
in steps 1 to 3
e) Before energizing the switchgear conduct Insulation resistance (Megger) and HV
Hipot tests ( optional ) as described in the instruction books.