Canned report - capacity report, Figure 3-10: canned report - capacity report – GE Industrial Solutions Galaxy Manager User Manual

Page 25

Advertising
background image

Galaxy Manager

Issue 4.3 Preliminary January 2004

User Screens 3 - 11

Canned Report -

Capacity report

Clicking this link displays a list of the sites/system, beginning with the
highest percentage of capacity (current capacity divided by maximum
capacity time 100) for that system. This report can be used to decide
which systems may need additional resources to handle capacities. (see
Figure 3-10).

Figure 3-10: Canned Report - Capacity Report

Advertising