Initial commissioning

Perform the following activities:

 Insert the batteries (see page 77)
 Connect the power pack (see page 17).
 Switch on the meter (see page 19)
 Set the language (see page 23)
 Set the date and time (see page 25)
 Set up the access authorization for electronic keys (see page 27)