3 initial commissioning, Initial commissioning – Xylem ProLab 1000 User Manual
Page 18
Advertising
![background image](/manuals/311266/18/background.png)
Commissioning
ProLab 1000
18
ba75576e05
11/2013
3.3
Initial commissioning
Perform the following activities:
Insert the batteries (see page 77)
Connect the power pack (see page 17).
Switch on the meter (see page 19)
Set the language (see page 23)
Set the date and time (see page 25)
Set up the access authorization for electronic keys (see page 27)
Advertising