Building and uploading a gc file, Step twelve: build the global configurator file, Software setup, cont’d – Extron Electronics IPL T PC1i Setup Guide User Manual

Page 23

Advertising
background image

IPL T PC1 Interface • Software Setup

Software Setup, cont’d

3-22

IPL T PC1 Interface • Software Setup

3-23

11.

If desired, follow steps 5 through 10 to add more

conditions. You can select either a port name or the device

name and IP address in the Subject Port field. In the

example below, a "day of the month" condition has been

added.

N

When you add multiple conditions,

all of the conditions

must be met in order for the specified action/e-mail to

occur.

12

. When finished adding conditions, click Next.

13

. If desired, select an action and click Apply Action. If not,

proceed to step 14.

14

. Click Next again if you want to add an e-mail message. If

not, click Done.

15

. If desired, select an e-mail message and contacts, and click

Apply Email/Contacts

.

16

. When finished, click Done. The dialog box closes.

Building and Uploading a GC File

Before a Global Configuration (GC) file is active in the

GlobalViewer interface, the GC file must be “built” and

“uploaded” to a GlobalViewer host device.
The “build” process compiles all of the configuration data you

have entered into the GC file for each A/V network device.
The “upload” process delivers the built (compiled) file to the

GlobalViewer host device.
After the GC file has been uploaded to a host device, you can

launch the GlobalViewer interface by entering the host device’s

IP address in the address field of an Internet browser.

Step Twelve: Build the Global Configurator file.

There are two Build commands:
Build All Configurations

— Compiles configuration data for all

devices in the GC file, including data for devices previously

uploaded to a GlobalViewer host device.

Build Changed Configurations

— Compiles configuration data

only for devices that have been added or changed since the

previous build cycle.

To initiate a “Build (all)” process,
1

.

From the Build menu, select Build All Configurations...,

or

click the Build All Configurations icon (shown

at right).

The Please Wait. Building Configuration(s)... dialog

box opens and displays a progress bar while the GC file is

being built.

Advertising
This manual is related to the following products: