DDiissaasssseem

mbbllyy aanndd RReeaasssseem

mbbllyy

IInnssttrruuccttiioonnss,, SSO

OHH

W

WAARRNNIINNG

G:: DDIISSCCO

ONNNNEECCTT AANNDD LLO

OCCKK O

OUUTT EELLEECCTTRRIICCAALL

PPO

OW

WEERR BBEEFFO

ORREE PPEERRFFO

ORRM

MIINNG

G M

MAAIINNTTEENNAANNCCEE..

CCAAUUTTIIO

ONN:: PPaarrttss m

muusstt bbee rreeaasssseem

mbblleedd iinn eexxaaccttllyy tthhee ssaam

mee

rreellaattiivvee ppoossiittiioonnss.. TThheerreeffoorree,, iitt IIss rreeccoom

mm

meennddeedd tthhaatt eeaacchh

ppaarrtt bbee m

maarrkkeedd aass iitt iiss rreem

moovveedd ffrroom

m tthhee m

maacchhiinnee ttoo ffaacciillii--

ttaattee llaatteerr rreeaasssseem

mbbllyy.. IItt iiss eessppeecciiaallllyy iim

mppoorrttaanntt tthhaatt tthhee

llooccaattiioonn ooff eeaacchh iim

mppeelllleerr,, aass wweellll aass iittss ppoossiittiioonn oonn tthhee

sshhaafftt,, bbee m

maarrkkeedd..

When ordering replacement impellers and deflectors, refer to

the Notes on accompanying illustration.
DDiissaasssseem

mbbllyy

1. Remove End Head Bolts (5) and End Head (6).
2. Mark the motor shaft and impeller (8) hub with an arbitrary

12 oʼclock reference point. Remove the first stage impeller

(8A) and mark it for reference during reassembly.

3. Check axial position of each deflector (7) at four radial

points with reference to end of housing and record for refer-

ence when reassembling unit.

4. Remove spacer (14A) holding rope packing (4) in place.

Mark spacer for reference during reassembly.

5. Remove rope packing (4) holding deflector in place. Remove

deflector (7A). Mark for reference during reassembly.

6. Proceed to remove remaining stages in the same way,

marking each component to insure proper reassembly.
Note: Division Head (3) cannot be removed.

7. Unbolt division head packing plate (2A) and slide packing

plate and packing (2) back on the shaft.

8. Remove motor mounting bolts and slide motor (1) back.
RReeaasssseem

mbbllyy

1. Place the division head packing plate (2A) and packing (2)

on the shaft. If for any reason the packing (2) is damaged,

replace it. Install the motor (1) in the housing in its original

position. Be sure that the shaft is centered in the housing.

Assemble the packing (2) and packing plate (2A) to the

division head.

2. Run the motor (1) to check for vibration. If excessive vibration

is present, check the shaft for runout.

3. Place the first impeller (8C) on the shaft up against the division

head (3). Mark the shaft approximately 1/8" out and with-

draw the impeller to this point. This will insure a clearance

of 1/8" behind the impeller. Tighten the hub securely.

4. Inspect the interstage packing (9), if applicable, on deflector

(7B) and replace if damaged.

5. Place deflector (7B) back tightly against the stops in the

casing. Install the rope packing (4) firmly into the groove,

using a suitable tool.

6. Install the next impeller (8B) on the shaft up against the

deflector (7B). Mark the shaft approximately 1/8" out and

withdraw the impeller to this point. Tighten the hub securely.

7. Install the spacer (14B) into the housing. Make sure spacer

and deflector (7B) are pressed back tightly and at a uni-

form distance from the end of the casing at four points.

8. Proceed in a like manner with remaining impellers, spacers

and deflectors.

9. Reassemble the end head (6) to the housing using a new

endhead gasket (12).

BBaallaanncciinngg
Each machine is fully tested before leaving the Spencer factory

to be sure vibrations, if any, are well within specifications for this

particular machine. However, rough handling during shipment

or improper disassembly and reassembly of a machine can

upset its balance and/or result in excess vibration.
If there is any vibration due to an unbalanced condition after

assembly, use the following procedure.
After running at operating speed and when at rest, mark posi-

tion of end impeller hub on shaft. Loosen bolts or screws holding

impeller on shaft. Rotate impeller 90° on shaft. Retighten bolts

or screws. Run machine again at operating speed and check

vibration. Repeat this process until the best position is located

for the impeller on the shaft so that there is no vibration in the

machine.
NOTE: In the event of problems following repair procedures,

contact the Spencer Service Department or your Spencer

Representative, describing the nature of the difficulty. Also furnish

the machine serial number.