Spencer 4BOB Multistage Centrifugal Blowers User Manual

Page 15

Advertising
background image

DDiissaasssseem

mbbllyy aanndd RReeaasssseem

mbbllyy

IInnssttrruuccttiioonnss,, 44BBO

OBB

W

WAARRNNIINNG

G:: DDIISSCCO

ONNNNEECCTT AANNDD LLO

OCCKK O

OUUTT EELLEECCTTRRIICCAALL

PPO

OW

WEERR BBEEFFO

ORREE PPEERRFFO

ORRM

MIINNG

G M

MAAIINNTTEENNAANNCCEE..

CCAAUUTTIIO

ONN:: PPaarrttss m

muusstt bbee rreeaasssseem

mbblleedd iinn eexxaaccttllyy tthhee ssaam

mee

rreellaattiivvee ppoossiittiioonnss.. TThheerreeffoorree,, iitt iiss rreeccoom

mm

meennddeedd tthhaatt eeaacchh

ppaarrtt bbee m

maarrkkeedd aass iitt iiss rreem

moovveedd ffrroom

m tthhee m

maacchhiinnee ttoo ffaacciillii--

ttaattee llaatteerr rreeaasssseem

mbbllyy.. iitt iiss eessppeecciiaallllyy iim

mppoorrttaanntt tthhaatt tthhee

llooccaattiioonn ooff eeaacchh iim

mppeelllleerr,, aass wweellll aass iittss ppoossiittiioonn oonn tthhee

sshhaafftt,, bbee m

maarrkkeedd..

When ordering replacement impellers and deflectors, refer to

Notes on accompanying illustrations.

CCAAUUTTIIO

ONN:: M

Moosstt ffoouurr--bbeeaarriinngg oouuttbbooaarrdd m

maacchhiinneess hhaavvee aa

dduupplleexx ((ttaannddeem

m)) bbeeaarriinngg aasssseem

mbbllyy.. TThheessee bbeeaarriinnggss aarree aavvaaiill--

aabbllee oonnllyy ffrroom

m SSppeenncceerr aass aa ccuussttoom

m--m

maattcchheedd sseett ooff ttwwoo:: oonnee

bbeeaarriinngg ffoorr tthhrruusstt aanndd oonnee bbeeaarriinngg ffoorr rraaddiiaall llooaadd.. TThheessee

bbeeaarriinnggss aarree nnoott iinntteerrcchhaannggeeaabbllee wwiitthh ccoom

mm

meerrcciiaallllyy aavvaaiillaabbllee

bbeeaarriinnggss ccaarrrryyiinngg tthhee ssaam

mee ppaarrtt nnuum

mbbeerr;; tthheeyy ccaann oonnllyy bbee

uusseedd IInn m

maattcchheedd sseettss aass ffuurrnniisshheedd bbyy TThhee SSppeenncceerr TTuurrbbiinnee

CCoom

mppaannyy.. FFoorr bbeesstt rreessuullttss,, ffoollllooww iinnssttrruuccttiioonnss eenncclloosseedd wwiitthh

eeaacchh m

maattcchheedd sseett ooff bbeeaarriinnggss..

DDiissaasssseem

mbbllyy && RReeaasssseem

mbbllyy

1. Remove packing plate nuts from packing plate (32 and 20)

on each end of machine. Slide both packing plates and

packing (32 and 20) on shaft away from heads. Remove all

packing from packing box when applicable (38 & 39).

2. Remove snap ring and back off coupling sleeve. Check gap

between coupling hubs. See coupling manufacturerʼs

instructions for other than Sier Bath.

3. Measure distance “B” from outboard bearing bracket (19) to

outboard bearing cap (17). Remove bolts in thrust assembly

housing cap.

4. Remove lock nut (15) and washer from end of shaft, and

loosen bolt (19A) binding housing in bracket.

5. Remove bracket bolts (21). Using puller, remove complete

thrust assembly and bearings.

6. Remove bolts on end head, holding flat ring and end head to

housing. (Use a chain hoist if available to hold head while

removing bolts). After removal of end head, keep shaft

supported while removing internal parts.

7. Remove intake spiral (13) after marking position to insure

correct reassembly. See note (A).

8. Remove rope packing (10) and half deflector (26).
9. On other than keyed construction, measure distance from

impeller hub to any step or shoulder on shaft and mark for

reassembly. On stacked and keyed construction, remove

nuts and washers (24A) and shaft sleeves (24B). Remove

impeller (29) and its hub spacer, number or mark them for

replacement in their proper position. See note (B) following

paragraphs.

10. Check axial position of each deflector at 4 radial points with

reference to end of housing and record.

11. Remove spacer (27) holding rope packing in place. Number

or mark for replacement.

12. Remove rope packing holding deflector in place. Then pull

or work deflector (11) out of housing. Number or mark for

replacement.

13. Proceed to remove the remaining stages in the same way,

numbering or marking all impellers, spacers, deflectors, etc.,

to insure proper replacement.

14. Check deflector stops for damage.
15. Reassemble in reverse order, replacing end head gasket

(22) and any worn packing (32, 10, 25, 20).

TToo CChhaannggee tthhee IInnbbooaarrdd BBeeaarriinngg ((M

Moottoorr EEnndd ooff tthhee M

Maacchhiinnee))

1. Remove snap ring and back off coupling sleeve.
2. Check gap on coupling hubs.
3. Loosen and remove motor bolts, and slide motor back.
4. Remove coupling hub from machine shaft.
5. Remove packing plate nuts from packing plate (32 and 20)

on each end of machine. Slide both the packing plates and

packing (32 and 20) on the shaft away from the heads.

Remove all packing from packing box where applicable.

6. Remove bolts on both caps (8 and 8A) on three-arm bearing

bracket (33).

7. Slide front cap off shaft, and push back cap away from bracket.
8. Remove bolts holding inboard bracket in position while

supporting end of shaft.

9. Slide inboard bracket off bearing.
10. Remove locknut, washers, and bearing.
11. Replace bearing and parts in their proper order.

Realign coupling and check the hub before and after bolting

motor in place (Refer to page 5).
NNootteess::
(A) Upon reassembly, with all internal parts installed, the intake

spiral edge should project slightly beyond end of housing so that

end head will hold all stationary parts in position.
(B) On stacked and keyed impeller construction, the first nut

installed is tightened with a spanner wrench, then loosened one

full turn to allow for impeller hub expansion. The second nut is

brought up to the first nut with the lockwasher in between. Lock

nut in position with washer tabs.
BBaallaanncciinngg
Each machine is fully tested before leaving the Spencer factory

to be sure vibration, if any, is within specifications for the partic-

ular machine. However, rough handling during shipment or

improper disassembly and reassembly of a machine can upset

its balance and result in excess vibrations.
When a machine is being disassembled for repairs, mark the

parts as they are removed. There should be no vibration when

they are reassembled in the same order.
However, if impellers are being replaced or there is any vibration

due to an unbalanced condition after assembly, use the following

procedure:
If there is any vibration or unbalance, the coupling should be

checked first for misalignment. If realignment does not correct the

imbalance, rotate coupling hubs or machine shaft and motor

shaft in 90° increments until minimal vibration is obtained.
NOTE: In the event of problems following repair procedures,

contact the Spencer Service Department or your Spencer

Representative, describing the nature of the difficulty. Also

furnish the machine serial number.

1155