Alpha Technologies AlphaGen PN-6x-T 7.5kW 48VDC - Technical Manual User Manual

Page 84

Advertising
background image

84

042-288-B0-001, Rev. A

Fig. 7-10, Load Block, PN-6x-T 7.5kW

(natural gas confi guration)

Fig. 7-11, Changing Load Block Confi guration, PN-6x-T 7.5kW

7.0 Maintenance,

continued

7.8

Fuel Conversion, Natural Gas to LP, continued

7.8.2 Switching the LP Port to the NG Port, PN-6x-T

Required Tools:

7/8" open-end wrench

NFPA-approved pipe sealant

In this procedure, the gas inlet hose is switched from the LP port to the NG port.
Reverse this process if converting from natural gas to liquid propane.

1. Loosen swivel connector and remove from fl are fi tting.

2. Turning counterclockwise, remove fl are fi tting and plug from unused port.

3. Coat all but last two threads of the fl are fi tting and plug.

4. Reinstall

fl are fi tting and plug into the opposite holes, reconnect hose.

5. Set the selector switch on the Gas Hazard Sensor to the correct setting.

6. Apply gas pressure and test all fi ttings for leaks with test solution or soapy water.

The following procedure must only be performed by qualifi ed personnel. To prevent
injury, disable generator and disconnect gas supply prior to beginning the gas conversion
procedure.

WARNING!

Advertising
This manual is related to the following products: