J&M Roll Tarp GRAIN CARTS (June 2011 & newer) User Manual

Page 12

Advertising
background image

12

Install Stop Tube

Insert Roll Tarp Tubes

Prepare the canvas tarp. Spread the canvas tarp our so that the 3 stiffening patches are on the opposite auger side

with the schiney part down. Install the 1-1/4” steel tube through the opposite auger side canvas tarp end. Then

feed the 1” steel tube through the auger side tarp end.

CANVAS TARP

1-1/4” S

te

el T

ub

e

1” S

te

el T

ub

e

Front Corner of Cart

On the auger side of the grain cart, measure 2” from the end of the tube. This is where the canvas tarp should

stop. Now measure 3/4” over onto the canvas tarp. Drill a 1/4” hole through the tarp and the first wall on the

tube. Next install a pop rivet using a hammer. Now go to the opposite end of the same tube and pull the tarp

tight. Measure 3/4” from the end of the tarp, drill a 1/4” hole and install another pop rivet.

2”

3/4”

Tools Needed:

1/4” Drill Bit

Hammer

1” Steel Tube

1-1/4” Steel Tube

Advertising