CHIEF WP2XS_WP2XUS User Manual

Page 7

Advertising
background image

Installation Instructions

WP2XS, WP2XUS

7

Site Requirements

Figure 3

(Must be centered over two studs)

Drywall

**1/2" minimum

Drywall Thickness

Short Throw Mount Installation Location

FRONT

(Both Sides of Stud)

There must be a minimum of
1-7/8" (48mm) clearance
inside wall

16" (on center) Studs

If back side of wall is unfinished, drywall must be installed
to a minimum of one stud left and right of the studs
being used to install the mount. Drywall must be
secured to studs with screws 12" on center

Steel Stud (2 x 4 / 25ga minimum)
Stud type and structural strength must conform to the North American
Specification for the Design of Cold-Formed Steel Structural Members.

**See hazard statement

on page 2!

[362, 125 18, C-Shape, S - Stud Section]

Advertising